I'm rebuilding a Dana 30 HP out of a 1997 XJ. I have installed a ARB RD103 locker (30 spline) and am using Revolution shafts (DC-Dana 30-TJ-30). I'm using Blaine's knuckles from the Super 16" BBK and re-using my Timken unit bearings (HA597449).
Passenger side shafts went in just fine - they had some back and forth play before tightening up the axle nut. My issue is the driver side shaft are about 1/16" too long. It is bottoming out in the locker leaving a gap between the unit bearing and the knuckle. I've tried a few light taps but it's definitely bottomed out. Any ideas?




Passenger side shafts went in just fine - they had some back and forth play before tightening up the axle nut. My issue is the driver side shaft are about 1/16" too long. It is bottoming out in the locker leaving a gap between the unit bearing and the knuckle. I've tried a few light taps but it's definitely bottomed out. Any ideas?





